Filtrer og download specifik information efter nøgleord.
NKT will deliver and install the 400 kV HVDC cable system for transmission of sustainable hydropower from Canada to New York City.
Gå til sidenNKT cable system ensuring transmission of renewable energy by connection BorWin5 to shore
Gå til sidenNKT cables to bring clean power to over 1.5 million homes with Poland’s first offshore wind farm.
Gå til sidenSupporting electric transportation with new charging connections for heavy vehicles
Gå til sidenStöttar elektrisk transport med nya stationer för tung fordonsladdning
Gå til sidenNKT introduces the next generation of power distribution cables manufactured with low carbon materials
Gå til sidenNKT introducerar nästa generation kraftdistributionskablar tillverkade av material med lågt koldioxidavtryck
Gå til sidenBreezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
Gå til sidenThe Horns Rev 3 wind farm is located in the North Sea, about 30 km off the western-most point of Denmark, Blåvands Huk, and not far from the city of Esbjerg. The 400 MW (megawatt) wind farm has the capacity to supply electricity to around 400,000 households.
Gå til sidenOur pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Gå til siden